Three distribution sites, Thames Gateway

Enterprise

Three distribution sites, Thames Gateway

A logistics operator running three chilled warehouses. We delivered 1.4 MW of rooftop solar across all three sites in one programme, with a single monitoring dashboard and a five-year maintenance contract.

At a glance

System size
1.4 MW
Bill saving
39%
Annual generation
1,210,000 kWh
Payback
5.1 years
Battery
500 kWh
CO2 saved
250 t / year
Install time
14 weeks
Location
Dartford, Thurrock and Basildon

The brief

Kestrel Cold Chain runs refrigerated distribution for supermarkets from three warehouses along the Thames Estuary. Chillers run around the clock, and a tariff renewal in 2025 put their annual electricity spend past £1.1 million.

The board wanted a meaningful cut in that number, a credible route to their 2030 emissions target, and one supplier accountable for all three sites.

The system

All three buildings have large, shallow-pitch standing-seam roofs, so we used clamp-on mounting with no penetrations across a combined 11,000 m². Each site got its own three-phase inverter bank, and the Dartford hub added a 500 kWh battery to shave the afternoon demand peak that was driving their capacity charges.

The three sites report into one dashboard that the facilities team and the finance team both use.

  • 3,260 panels across three roofs, 1.4 MW total
  • Clamp-on standing-seam mounting, zero penetrations
  • 500 kWh battery at Dartford for peak shaving
  • Single fleet-wide monitoring dashboard
  • Five-year Auren maintenance and cleaning contract

The result

Across the first twelve months the three arrays generated 1.21 GWh, 92% of which was used on site because the chillers never stop. Electricity spend fell by £430,000 against the previous year's tariff, and the Dartford battery cut the site's peak demand charge by a further £38,000.

Scope 2 emissions across the estate dropped by 250 tonnes, which put Kestrel two years ahead of its 2030 plan.

Three distribution sites, one programme. The monitoring dashboard flagged a string fault before we noticed a dip, and it was fixed the same week

Priya Nair
Priya Nair
Operations Director, Kestrel Cold Chain • 1.4 MW across 3 sites
Solar panels on a timber house roof above green hills

The right way,
every time.

Our accreditations aren’t just badges on a page. They’re proof that our work meets recognised industry standards, from the products we install to the way every system is designed, fitted and maintained.

MCS Certified and APHC accreditation marks